Logo
  • Irrigation & Waterways Department

WBMIFMP

NIQ 01 DPD-VI, DPMU-II,WBMIFMP

NIQ 02 DPD-VI,DPMU-II WBMIFMP

NIQ 08 DPD-VI, DPMU-II, WBMIFMP

2nd call_REoI_Automatic Gates

01 WBMIFMP-APD-IV-NCB2-24AMTA-FIELD-HOSTEL

REOI of Automatic Hydraulic Gates on River Mundeswari at Chingra Khanakul-II Hooghly under WBMIFMP I&WD GoWB

Notice Inviting Quotation: 02/DPD-VI,DPMU-II,WBMIFMP of 2023-2024

NIQ 09 DPD-VI, DPMU-II, WBMIFMP

NIQ 08 DPD-VI, DPMU-II, WBMIFMP

NIQ 07 DPD-VI, DPMU-II, WBMIFMP

Additional-Prebid-Query-Response

Response_Prebid Query_with_WBMIFMP_Flood_Modelling_StudyMathematical_Model_Darakeswar-Rupnarayan

1st_corrigendum_math_model_Darakeswar_Rupnarayan 19-12-22

2nd Corrigendum Addendum FM XI Howrah(I) Divn

Minutes Pre Quotation Meeting_FM_XI.pdf

1st Corrigendum_FM_XI

DBEC_REoI Mathematical Model Darakeswar Rupnarayan

RFQ_Soil_Investigation_FM_XI.pdf

MOM_PREBID_M&E_04.11.2022.pdf

Intimation to Successful Consultants as per DBEC Evaluation_ REoI_M & E_RFP_ISSUED

Intimation to Successful Consultants as per DBEC Evaluation_ REoI_M & E_RFP_NOT_ISSUED

Intimation to Unsuccessful Consultants as per DBEC Evaluation_ REoI_M & E

ToR Mathematical Model Study Darakeshwar-Rupnarayan Modified

1st Corrigendum REoI Mathematical Model Study Darakeshwar-Rupnarayan

REoI Mathematical Model Study Darakeshwar-Rupnarayan

ToR Mathematical Model Study Darakeshwar-Rupnarayan

M & E REOI 1st Corrigendum.pdf

REOI-M & E Consultant.pdf

TOR for M & E Consultant.pdf

NIQ 04 DPD-VI, DPMU-II, WBMIFMP of 2022-23.pdf

NIQ 03 DPD-VI, DPMU-II, WBMIFMP of 2022-23.pdf

3rd corrigendum/ Addendum for IRR-14

2nd_corrigendum_IRR14.pdf

2nd_corrigendum.pdf

Addendum-1 RFB IRR14 Signed.pdf

Addendum-1 RFB IRR09 Signed.pdf

Addendum-1 RFB IRR08 Signed.pdf

Addendum-1 RFB IRR07 Signed.pdf

Minutes Prebid IRR14 Signed.pdf

Minutes Prebid IRR12 Signed.pdf

Minutes Prebid IRR10 Signed.pdf

Minutes Prebid IRR09 Signed.pdf

Prebid Minutes IRR07 of WBMIFMP.pdf

Prebid Minutes IRR08 of WBMIFMP.pdf

PROCUREMENT OF CIVIL WORKS THROUGH REQUEST FOR QUOTATION RFQ SHOPPING PROCEDURES

Intimation to Unsuccessful Consultants as per DBEC Evaluation_ REoI_TPI

Intimation to Successful Consultants as per DBEC Evaluation_ REoI_TPI

Queries & Responses regarding REOI of TPI as on 15.07.2021

1st_Corrigendum_REOI_TPI_07.07.2021

REOI_TPI_07.07.2021

ToR_TPI_07.07.2021

cancellation of RFQ 01 DPD-VI

RFQ 01 2021-22

Notification of Award

RFQ No 07 DPD-VI, DPMU-II. WBMIFMP of 2020-21

RFQ No 05 DPD-VI, DPMU-II, WBMIFMP of 2020-21

Minutes_of_PreBid_Meeting_Package_X

Terms of Reference for engagement of Non-Government Organizations for Implementation of Resettlement Action Plan

RFQ No 04 DPD-VI, DPMU-II, WBMIFMP of 2020-21

RFQ No 03 DPD-VI, DPMU-II, WBMIFMP of 2020-21

TOR for NGO with Appendix - VI to X

REOI-NGO-RAP

1st Corrigendum-IRR-01

1st Corrigendum-IRR-02

1st Corrigendum-IRR-03

1st Corrigendum-IRR-04

1st Corrigendum-IRR-05

1st Corrigendum-IRR-06

PreBid_Minutes_IRR01

PreBid_Minutes_IRR02

PreBid_Minutes_IRR03

PreBid_Minutes_IRR04

PreBid_Minutes_IRR05

PreBid_Minutes_IRR06

Notice to Proceed with the work_PKG_V_Lot _1

Notice to Proceed with the work_PKG_V_Lot _3

Notice to Proceed with the Work_ PACKAGE I

Contract Award Notice_Pkg V_Lot 3

Contract Award Notice_Pkg V_Lot 1

PMC Notification of Contract Award

Contract Award Notice _Package I

Cancellation of NIQ No 01/2019-20 of EE, Howrah Irrigation Division

Notification of Contract Award

Corrigendum of NIQ No-01/2019-20 of Howrah Irrigation Division

NIQ No-01/2019-20 of Howrah Irrigation Division

Issue of Notice to proceed with the work

Contract Award Notice

Revised Final Annexure ESIA Volume II WBMIFMP 22 OCT 2019

Revised Final ESIA with ESMP WBMIFMP 16 OCT 2019

Revised Final Annexure ESIA Volume I WBMIFMP 16 OCT 2019

Final ESMF WBMIFMP 21 Aug 2019

Final ESIA with ESMP WBMIFMP 21 Aug 2019

Final Annexure ESIA Volume II WBMIFMP 21 Aug 2019

Final Annexure ESIA Volume I WBMIFMP 21 Aug 2019

Bengali Executive Summary ESMP WBMIFMP 21 Aug 2019

RAP Final WBMIFMP

ESMF Final WBMIFMP

ESIA with ESMP Final WBMIFMP

Annexure ESIA Final WBMIFMP

1st Corrigendum / Addendum Notice of REoI for the work - Selection of Consultancy firm for “Providing Human Resource support to the Project Management Units of WBMIFMP during project implementation period in the State of West Bengal in India.

Further List of Queries from Potential Bidders for Package-I along with Responses Of IWD.

Providing Human Resource support to the Project Management Units of WBMIFMP during project implementation period in the State of West Bengal in India.

Providing Human Resource support to the Project Management Units of WBMIFMP during project implementation period in the State of West Bengal in India.

Minutes of the Pre-Bid Meeting and Responses to QUERIES FROM POTENTIAL BIDDERS FOR BID PACKAGE-I as on 14.02.2019

Queries & Responses regarding REOI of PMC as raised by some potential bidders as on 07.02.2019

Further Queries & Responses regarding REOI of PMC as raised by some potential bidders as on 05.02.2019

Queries& Responses regarding REOI of PMC as raised by some potential Bidders, Dt. 05.02.2019

1st Corrigendum of REoI (Modified) for PMC, Dt. 01.02.2019

Flood Protection Measures on Damodar Left Embankment with Flood Wall, Sheet Piles, Bank Protection and Strengthening of Embankment in different reaches in the districts of Purba Bardhaman and Hooghly - Package - I, Dt. 31.01.2019

REOI (Modified) for PMC, Dt. 21.01.2019

REOI for PMC, Dt. 18.01.2019

Terms of Reference for PMC

Executive Summary of ESIA in connection with the WBMIFMP, I&WD

Executive Summary of RAP in connection with the WBMIFMP, I&WD

Executive Summary - ESIA - WBMIFMP, 30th Nov. 2018

Resettlement Action Plan WBMIFMP, 29th Nov. 2018

Full Annexure ESIA WBMIFMP, 23rd Nov. 2018

ESIA Report WBMIFMP, 23rd Nov. 2018

Proceedings of the 1st & 2nd Bidders' Conference held on 4th October 2018 & 19 November 2018 respectively.

The Draft Version of the ESIA in connection with the work WBMIFMP is disclosed for public.

West Bengal Major Irrigation and Flood Management Project (WBMIFMP), Report on Consultation Workshop held on 12.10.2018.

West Bengal Major Irrigation and Flood Management Project (WBMIFMP), (Funded by the World Bank and AIIB).

Resettlement Action Plan WBMIFMP.