WBMIFMP
NIQ 01 DPD-VI, DPMU-II,WBMIFMP
NIQ 08 DPD-VI, DPMU-II, WBMIFMP
01 WBMIFMP-APD-IV-NCB2-24AMTA-FIELD-HOSTEL
Notice Inviting Quotation: 02/DPD-VI,DPMU-II,WBMIFMP of 2023-2024
NIQ 09 DPD-VI, DPMU-II, WBMIFMP
NIQ 08 DPD-VI, DPMU-II, WBMIFMP
NIQ 07 DPD-VI, DPMU-II, WBMIFMP
Additional-Prebid-Query-Response
Response_Prebid Query_with_WBMIFMP_Flood_Modelling_StudyMathematical_Model_Darakeswar-Rupnarayan
1st_corrigendum_math_model_Darakeswar_Rupnarayan 19-12-22
2nd Corrigendum Addendum FM XI Howrah(I) Divn
Minutes Pre Quotation Meeting_FM_XI.pdf
DBEC_REoI Mathematical Model Darakeswar Rupnarayan
RFQ_Soil_Investigation_FM_XI.pdf
Intimation to Successful Consultants as per DBEC Evaluation_ REoI_M & E_RFP_ISSUED
Intimation to Successful Consultants as per DBEC Evaluation_ REoI_M & E_RFP_NOT_ISSUED
Intimation to Unsuccessful Consultants as per DBEC Evaluation_ REoI_M & E
ToR Mathematical Model Study Darakeshwar-Rupnarayan Modified
1st Corrigendum REoI Mathematical Model Study Darakeshwar-Rupnarayan
REoI Mathematical Model Study Darakeshwar-Rupnarayan
ToR Mathematical Model Study Darakeshwar-Rupnarayan
M & E REOI 1st Corrigendum.pdf
NIQ 04 DPD-VI, DPMU-II, WBMIFMP of 2022-23.pdf
NIQ 03 DPD-VI, DPMU-II, WBMIFMP of 2022-23.pdf
3rd corrigendum/ Addendum for IRR-14
Addendum-1 RFB IRR14 Signed.pdf
Addendum-1 RFB IRR09 Signed.pdf
Addendum-1 RFB IRR08 Signed.pdf
Addendum-1 RFB IRR07 Signed.pdf
Minutes Prebid IRR14 Signed.pdf
Minutes Prebid IRR12 Signed.pdf
Minutes Prebid IRR10 Signed.pdf
Minutes Prebid IRR09 Signed.pdf
Prebid Minutes IRR07 of WBMIFMP.pdf
Prebid Minutes IRR08 of WBMIFMP.pdf
PROCUREMENT OF CIVIL WORKS THROUGH REQUEST FOR QUOTATION RFQ SHOPPING PROCEDURES
Intimation to Unsuccessful Consultants as per DBEC Evaluation_ REoI_TPI
Intimation to Successful Consultants as per DBEC Evaluation_ REoI_TPI
Queries & Responses regarding REOI of TPI as on 15.07.2021
1st_Corrigendum_REOI_TPI_07.07.2021
RFQ No 07 DPD-VI, DPMU-II. WBMIFMP of 2020-21
RFQ No 05 DPD-VI, DPMU-II, WBMIFMP of 2020-21
Minutes_of_PreBid_Meeting_Package_X
RFQ No 04 DPD-VI, DPMU-II, WBMIFMP of 2020-21
RFQ No 03 DPD-VI, DPMU-II, WBMIFMP of 2020-21
TOR for NGO with Appendix - VI to X
Notice to Proceed with the work_PKG_V_Lot _1
Notice to Proceed with the work_PKG_V_Lot _3
Notice to Proceed with the Work_ PACKAGE I
Contract Award Notice_Pkg V_Lot 3
Contract Award Notice_Pkg V_Lot 1
PMC Notification of Contract Award
Contract Award Notice _Package I
Cancellation of NIQ No 01/2019-20 of EE, Howrah Irrigation Division
Notification of Contract Award
Corrigendum of NIQ No-01/2019-20 of Howrah Irrigation Division
NIQ No-01/2019-20 of Howrah Irrigation Division
Issue of Notice to proceed with the work
Revised Final Annexure ESIA Volume II WBMIFMP 22 OCT 2019
Revised Final ESIA with ESMP WBMIFMP 16 OCT 2019
Revised Final Annexure ESIA Volume I WBMIFMP 16 OCT 2019
Final ESMF WBMIFMP 21 Aug 2019
Final ESIA with ESMP WBMIFMP 21 Aug 2019
Final Annexure ESIA Volume II WBMIFMP 21 Aug 2019
Final Annexure ESIA Volume I WBMIFMP 21 Aug 2019
Bengali Executive Summary ESMP WBMIFMP 21 Aug 2019
Further List of Queries from Potential Bidders for Package-I along with Responses Of IWD.
Queries & Responses regarding REOI of PMC as raised by some potential bidders as on 07.02.2019
Queries& Responses regarding REOI of PMC as raised by some potential Bidders, Dt. 05.02.2019
1st Corrigendum of REoI (Modified) for PMC, Dt. 01.02.2019
REOI (Modified) for PMC, Dt. 21.01.2019
Executive Summary of ESIA in connection with the WBMIFMP, I&WD
Executive Summary of RAP in connection with the WBMIFMP, I&WD
Executive Summary - ESIA - WBMIFMP, 30th Nov. 2018
Resettlement Action Plan WBMIFMP, 29th Nov. 2018
Full Annexure ESIA WBMIFMP, 23rd Nov. 2018
ESIA Report WBMIFMP, 23rd Nov. 2018
The Draft Version of the ESIA in connection with the work WBMIFMP is disclosed for public.