Logo
  • Irrigation & Waterways Department

Irrigation Water Releases through Dam/Barrage


Sl. No Dam/Barrage Date Left Bank Canal (acft ) Right Bank Canal (acft) Total water released in acft
1 Massanjore Dam 2022-09-13 0.0000 0.0000 0.0000
2 Tilpara Barrage 2022-09-13 0.0000 0.0000 0.0000
3 Tilpara Barrage 2022-09-12 0.0000 0.0000 0.0000
4 Massanjore Dam 2022-09-12 103.7000 0.0000 103.7000
5 Tilpara Barrage 2022-09-11 726.6600 1089.0000 1815.6600
6 Massanjore Dam 2022-09-11 268.8000 0.0000 268.8000
7 Tilpara Barrage 2022-09-08 0.0000 0.0000 0.0000
8 Massanjore Dam 2022-09-08 275.6000 0.0000 275.6000
9 Massanjore Dam 2022-09-07 270.5000 0.0000 270.5000
10 Tilpara Barrage 2022-09-07 0.0000 0.0000 0.0000
11 Tilpara Barrage 2022-09-06 0.0000 0.0000 0.0000
12 Massanjore Dam 2022-09-06 271.5000 0.0000 271.5000
13 Tilpara Barrage 2022-09-05 1815.6600 1089.0000 2904.6600
14 Massanjore Dam 2022-09-05 263.7000 0.0000 263.7000
15 Tilpara Barrage 2022-09-04 1683.0000 1683.0000 3366.0000
16 Massanjore Dam 2022-09-04 254.9000 0.0000 254.9000
17 Tilpara Barrage 2022-09-03 124.7000 1934.4600 2059.2000
18 Massanjore Dam 2022-09-03 237.9000 0.0000 237.9000
19 Tilpara Barrage 2022-09-02 841.5000 2376.0000 3217.5000
20 Massanjore Dam 2022-09-02 95.3000 0.0000 95.3000