Logo
  • Irrigation & Waterways Department

Important Links

Tenders of I&W Dept.

Archive Tender

Search Tenders
Search By Niit no../Details :
Search By Date :
    

Tenders of I&W Dept. are given below :


Sl. No NIT No Tender Date Tender Submission Date Tender Opening Date Details Document
1 NIT-03/SDO/KCSD XIII of 2021-22 2022-01-20 19:04:00 2022-01-31 15:00:00 2022-01-31 15:30:00 Sub Soil Investigation for proposed C.C lining work under Kangsabati Canals Sub-Division No-XIII, Bamda, Jhargram View
2 WBIW/SDO/LISD/NIT-08L of 2021-2022 2022-01-20 18:57:00 2022-01-27 16:30:00 2022-01-27 17:00:00 Sub Divisional Officer, Lachmapur (I) Sub Division invites tender for the 11(Eleven) nos. works amount Put to Tender is minimum Rs. 151718.00 and maximum… View
3 WBIW/EE/SDP/RRI/eNIT-19/2021-22 2022-01-20 17:51:00 2022-02-10 14:00:00 2022-02-10 16:00:00 Collection of Soil/Sand samples from different rivers and locations for potential desiltation under the juridiction Irrigation and Waterways Directorate,… View
4 CORRIGENDA 01 OF NIT-23/DCD/2021-22 2022-01-20 17:32:00 2022-01-25 13:30:00 2022-01-25 13:35:00 CORRIGENDA 01 OF NIT-23/DCD/2021-22 View
5 N.I.Q No - 03(m)/2021-22 of Executive Engineer, Cooch Behar Irrigation Division 2022-01-20 17:30:00 2022-02-01 15:00:00 2022-02-01 15:30:00 N.I.Q No - 03(m)/2021-22 of Executive Engineer, Cooch Behar Irrigation Division View
6 WBIW/NHP/RFQ-09/2021-22 (Survey of embankments under KKB Master Plan) 2022-01-20 17:00:00 2022-02-23 15:00:00 2022-02-23 16:00:00 Name of work - Survey of embankments under KKB Master Plan and corresponding Mapping and Health Checking under NHP of I&W Deptt GoWB. View
7 NIT-08 OF 2021-22 2022-01-20 16:21:00 2022-01-31 14:30:00 2022-01-31 15:00:00 Labour supply works for Smooth working of KLBSD-II View
8 WBIW/EE/SDP/RRI/eNIT-18/2021-22 2022-01-20 15:18:00 2022-02-09 12:00:00 2022-02-09 15:00:00 Collection of Soil/Sand samples from different rivers & locations for potential desiltation under the juridiction of Irrigation & Waterways Directorate,… View
9 WBIW/EE/HUGID/e-NIT-02/21-22 2022-01-20 14:39:00 2022-01-31 11:00:00 2022-01-31 15:00:00 01 NO Non plan work View
10 NOTICE INVITING QUOTATION NO- 05 OF 2021-22 OF EXECUTIVE ENGINEER, B IRRIGATION DIVN. 2022-01-20 10:00:00 2022-01-27 13:00:00 2022-01-27 14:30:00 NOTICE INVITING QUOTATION NO- 05 OF 2021-22 OF EXECUTIVE ENGINEER, B.I.DIVISION. View
11 EoI - WBIWD/EE/CID/EoI-01/2021-22 2022-01-19 17:00:00 2022-01-19 18:00:00 2022-02-02 15:00:00 OFFICE OF THE EXECUTIVE ENGINEER, CONTAI IRRIGATION DIVISION, CONTAI PURBA MEDINIPUR (Sl. No. 1 & 2) View
12 e-NIT No. WBIW/SE/NIC-I/NIT-06(e)/2021-22 2022-01-19 10:30:00 2022-02-09 17:00:00 2022-02-10 17:00:00 01 (One) no Protection work of river Ganga (2nd Call) under Malda Irrigation Division. View
13 WBIW/EE/RBID/e-NIT- 01 /2021-22 2022-01-19 10:00:00 2022-02-01 14:00:00 2022-02-01 14:30:00 Renovation of Estimate Section, Sonamukhi Sub Division & Account section within the office premises of Right Bank Irrigation Division at Sonamukhi… View
14 WBIW/NHP/IFB-16/2021-22 2022-01-18 17:00:00 2022-02-21 15:00:00 2022-02-21 16:00:00 Name of work- SUPPLY INSTALLATION AND COMMISSIONING OF ONE NO DIESEL \nGENERATOR SET FOR THE STATE DATA CENTRE OF I&W DEPARTMENT AT SALTLAKE KOLKATA,… View
15 WBIW/EE/MED/NIT- 11 of 2021-2022 2022-01-18 17:00:00 2022-01-31 15:00:00 2022-01-31 15:30:00 METROPOLITAN ELECTRICAL DIVISION View
16 WBIW/02/SDO/TISD-I OF 2021-22 2022-01-18 16:00:00 2022-01-24 15:00:00 2022-01-28 15:30:00 "Running and maintenance of TJMC from downstream of 19.430km to upstream of 21.960km to ensuring During-Boro Irrigation in Kranti Police Out Post,… View
17 e-NIT No.- WBIW/EE/CID/e-NIT-24/2021-22 2022-01-18 11:00:00 2022-01-18 12:00:00 2022-01-31 16:00:00 OFFICE OF THE EXECUTIVE ENGINEER, CONTAI IRRIGATION DIVISION, CONTAI PURBA MEDINIPUR. e-NIT No.- WBIW/EE/CID/e-NIT-24/2021-22 (Sl. no. 1 to 5) (2nd Call) View
18 01/SDO/MBISD OF 2021-22 2022-01-18 10:32:00 2022-01-28 15:00:00 2022-01-28 15:30:00 M/R work View
19 WBIW/EE/JOY/NIT-13(e)/2021-22 2022-01-17 10:00:00 2022-01-22 17:30:00 2022-01-24 14:00:00 05 (Five) nos. Flood Protection and mitigation work of \nSundarban Embankment at Kultala (I) Sub-Division under the jurisdiction of Joynagar Irrigation… View
20 WBIW/SE/NIC-I/EOI-03/2021-22 2022-01-15 10:30:00 2022-02-07 17:00:00 2022-02-08 17:00:00 e-EOI (3rd Call) for Engagement of a Consultant for preparation of a DPR for the remedial measures on Ganga Padma erosion View
1st CORRIGENDUM 2022-01-25 15:00:00 2022-02-07 17:00:00 2022-02-08 17:00:00 Pre qualification Criteria of EOI have been changed View