Important Links
Tenders of I&W Dept.
Archive Tender
Tenders of I&W Dept. are given below :
Sl. No | NIT No | Tender Date | Tender Submission Date | Tender Opening Date | Details | Document |
1 | 1st Corrigendum Notice of NIT NO. 01/AE-I/PIPD/2018-19 | 2018-06-29 17:16:00 | 2018-07-12 15:00:00 | 2018-07-12 15:30:00 | 1st Corrigendum Notice of NIT NO. 01/AE-I/PIPD/2018-19 | View |
2 | NIT NO. 01/SDO/PIPSD/2018-19 | 2018-06-29 16:58:00 | 2018-07-11 15:00:00 | 2018-07-11 15:30:00 | 7 Nos M/R works. | View |
3 | KANGSABATI REVENUE DIVISION NO-I,NIQ-01 | 2018-06-29 16:00:00 | 2018-07-17 14:30:00 | 2018-07-17 15:00:00 | KANGSABATI REVENUE DIVISION NO-I,NIQ-01 | View |
4 | 01/SDO/SSD OF 2018-19 | 2018-06-29 16:00:00 | 2018-07-13 14:00:00 | 2018-07-13 14:30:00 | Silabati Sub-Division, Silda, Jhargram under Kangsabati Canals Division No. V, Jhargram. | View |
Corrigendum No. I | 2018-07-04 14:00:00 | 2018-07-13 14:00:00 | 2018-07-13 14:30:00 | Corrigendum No. I in connection with N. I. T. NO. 01/SDO/SSD OF 2018-19 | View | |
5 | North Bengal Mechanical & Electrical Circle,NIT-01 | 2018-06-29 15:00:00 | 2018-07-03 17:00:00 | 2018-07-04 12:00:00 | North Bengal Mechanical & Electrical Circle,NIT-01 | View |
6 | WBIW/EE/GAED-II/NIT-3/2018-19 | 2018-06-29 13:30:00 | 2018-07-19 15:00:00 | 2018-07-19 15:30:00 | 2 Nos. Electrical Installation works | View |
7 | WBIW/EE/KCDIII/eNIT-01/18-19 | 2018-06-29 13:01:00 | 2018-07-13 17:30:00 | 2018-07-13 17:35:00 | Sub-Soil investigation and submission of report | View |
CORRIGENDUM NO 01 | 2018-07-11 15:41:00 | 2018-07-13 17:30:00 | 2018-07-13 17:35:00 | Due to technical reason, the BOQ has been changed. New BOQ please be downloaded from this corrigendum and uploaded this BOQ | View | |
8 | NIT No: 1 of 2018-19 of AE-III(PID) | 2018-06-29 12:00:00 | 2018-07-13 16:30:00 | 2018-07-17 15:00:00 | NIT No 1 of 2018-19 of AE-III(PID){list of works & their schedules are attached herewith} | View |
9 | 1st CORRIGENDUM OF NOTICE INVITING ‘e’-TENDER No. WBIW/SE/NEIC-I/NIT-03(e)/2018-19 | 2018-06-29 12:00:00 | 2018-07-16 17:30:00 | 2018-07-17 12:00:00 | Credential Criteria ( Major item) of the aforesaid work is to be read as Protection work Type-A instead of Protection work type-C which was mentioned… | View |
10 | e-NIT No.-WBIW/EE-I/DCD/e-NIT-06/2018-19 of Damodar Canal Division | 2018-06-29 11:00:00 | 2018-07-12 17:30:00 | 2018-07-13 11:00:00 | e-NIT No.-WBIW/EE-I/DCD/e-NIT-06/2018-19 of Damodar Canal Division | View |
11 | N.I.Q. NO. 06/EE/JID OF 2018-19 of Joynagar (I) Divn. | 2018-06-29 10:00:00 | 2018-07-06 14:00:00 | 2018-07-06 15:00:00 | Carrying out bank to bank cross sec survey work @100m. interval by boat in moderate depth & detailed survey along the length on either side of the… | View |
12 | WBIW/EE/JID/e-NIT-10/2018-19 | 2018-06-29 09:00:00 | 2018-07-13 17:00:00 | 2018-07-16 12:00:00 | Eight (8) nos. M/R & I/R works of S/E at diff. mouzas of Kuemari & Kultala (I) Sub-Divn. under Joynagar (I) Divn. | View |
13 | WBIW/SE/GCDC/NIT-04(e)/2018-19 | 2018-06-28 17:30:00 | 2018-07-03 11:00:00 | 2018-07-24 11:30:00 | WBIW/SE/GCDC/NIT-04(e)/2018-19 | View |
14 | WBIW/EE/PUAMIA001/PRL/e-NIT- 02 /18-19 | 2018-06-28 17:00:00 | 2018-07-12 12:00:00 | 2018-07-12 13:00:00 | Details are attached herewith. | View |
15 | NIT No:-02/SDO/KCSD XXI OF 2018-19 | 2018-06-28 17:00:00 | 2018-07-12 14:00:00 | 2018-07-12 14:30:00 | Sub-soil investigation for proposed C.C. lining in Dy-14R/TSMC(N) under K.C. Sub-Division No.XXI, Jhargram. | View |
16 | N.I.T No – WBIW / SDO / TBSD-III / NIT-01 / 2018-19 (2nd Call) | 2018-06-28 16:31:00 | 2018-07-09 14:00:00 | 2018-07-11 16:32:00 | “Construction of Catch Water Drain at Left Afflux Bundh of Teesta Barrage within 9.70 Km to 12.15 Km in P.S. – Mal, Block – Mal, Dist.-Jalpaiguri… | View |
17 | 01/SDO/KCSD XIX OF 2018-19 | 2018-06-28 16:00:00 | 2018-07-11 14:00:00 | 2018-07-11 14:30:00 | Kangsabati Canals Sub-Division No. XIX, Fulkushma, Bankura under Kangsabati Canals Division No. V, Jhargram. | View |
18 | 01/K.C.Sub.Divn.No.X/2018-19 | 2018-06-28 15:00:00 | 2018-07-06 14:00:00 | 2018-07-06 14:30:00 | 13 nos M/R work | View |
19 | NIT-01_AE-II_PIPD_2018-19 | 2018-06-28 15:00:00 | 2018-07-12 15:00:00 | 2018-07-12 15:30:00 | 6 Nos. M/R works related to Irrigation Canal system. | View |
20 | NIT-01 of 2018-19 AE-I, PI&PD; | 2018-06-28 15:00:00 | 2018-07-12 15:00:00 | 2018-07-12 15:30:00 | 2 Nos works | View |