Logo
  • Irrigation & Waterways Department

Irrigation Water Releases through Dam/Barrage


Sl. No Dam/Barrage Date Left Bank Canal (acft ) Right Bank Canal (acft) Total water released in acft
1 Tilpara Barrage 2019-07-06 0.0000 0.0000 0.0000
2 Massanjore Dam 2019-07-05 0.0000 0.0000 0.0000
3 Tilpara Barrage 2019-07-05 0.0000 0.0000 0.0000
4 Massanjore Dam 2019-07-04 0.0000 0.0000 0.0000
5 Tilpara Barrage 2019-07-04 0.0000 0.0000 0.0000
6 Massanjore Dam 2019-07-03 0.0000 0.0000 0.0000
7 Tilpara Barrage 2019-07-03 0.0000 0.0000 0.0000
8 Massanjore Dam 2019-07-02 0.0000 0.0000 0.0000
9 Tilpara Barrage 2019-07-02 0.0000 0.0000 0.0000
10 Massanjore Dam 2019-07-01 0.0000 0.0000 0.0000
11 Tilpara Barrage 2019-07-01 0.0000 0.0000 0.0000
12 Massanjore Dam 2019-06-30 0.0000 0.0000 0.0000
13 Tilpara Barrage 2019-06-30 0.0000 0.0000 0.0000
14 Massanjore Dam 2019-06-29 0.0000 0.0000 0.0000
15 Tilpara Barrage 2019-06-29 0.0000 0.0000 0.0000
16 Massanjore Dam 2019-06-28 0.0000 0.0000 0.0000
17 Tilpara Barrage 2019-06-28 0.0000 0.0000 0.0000
18 Massanjore Dam 2019-06-27 0.0000 0.0000 0.0000
19 Tilpara Barrage 2019-06-27 0.0000 0.0000 0.0000
20 Massanjore Dam 2019-06-26 0.0000 0.0000 0.0000