Logo
  • Irrigation & Waterways Department

Irrigation Water Releases through Dam/Barrage


Sl. No Dam/Barrage Date Left Bank Canal (acft ) Right Bank Canal (acft) Total water released in acft
1 Massanjore Dam 2021-06-07 0.0000 0.0000 0.0000
2 Tilpara Barrage 2021-06-07 0.0000 0.0000 0.0000
3 Massanjore Dam 2021-06-06 0.0000 0.0000 0.0000
4 Tilpara Barrage 2021-06-06 0.0000 0.0000 0.0000
5 Massanjore Dam 2021-06-05 0.0000 0.0000 0.0000
6 Tilpara Barrage 2021-06-05 0.0000 0.0000 0.0000
7 Massanjore Dam 2021-06-04 0.0000 0.0000 0.0000
8 Tilpara Barrage 2021-06-04 0.0000 0.0000 0.0000
9 Massanjore Dam 2021-06-03 0.0000 0.0000 0.0000
10 Tilpara Barrage 2021-06-03 0.0000 0.0000 0.0000
11 Massanjore Dam 2021-06-02 0.0000 0.0000 0.0000
12 Tilpara Barrage 2021-06-02 0.0000 0.0000 0.0000
13 Massanjore Dam 2021-06-01 0.0000 0.0000 0.0000
14 Tilpara Barrage 2021-06-01 0.0000 0.0000 0.0000
15 Massanjore Dam 2021-05-25 0.0000 0.0000 0.0000
16 Tilpara Barrage 2021-05-25 0.0000 0.0000 0.0000
17 Massanjore Dam 2021-05-24 0.0000 0.0000 0.0000
18 Tilpara Barrage 2021-05-24 0.0000 0.0000 0.0000
19 Massanjore Dam 2020-10-31 134.0000 0.0000 134.0000
20 Tilpara Barrage 2020-10-31 0.0000 0.0000 0.0000